Method for optimizing structure of ECT sensor and analyzing electromagnetic field

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11703474
APP PUB NO 20220341866A1
SERIAL NO

17433095

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The present application belongs to the technical field of monitoring of durability of concrete, and particularly relates to a method for optimizing a structure of an electrical capacitance tomography sensor and analyzing an electromagnetic field. A specific process of the method includes eight steps: parameter setting, geometric setting, material setting, mesh generation, physical field setting, solution, sensor structure optimization and calculation of electromagnetic field distribution. The method proposes a new concept for solving a forward problem of an ECT system based on COMSOL software. After modeling is completed, uniformity of a sensitive field of the ECT sensor is analyzed according to calculation results, and structural parameter values of components of the ECT sensor are adjusted to seek an optimal design scheme.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
QINGDAO UNIVERSITY OF TECHNOLOGYQINGDAO

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Bao, Jiuwen Shandong, CN 6 4
Wang, Wentao Shandong, CN 145 1713
Zhang, Peng Shandong, CN 846 8792
Zhao, Kaiyue Shandong, CN 1 0
Zhao, Tiejun Shandong, CN 18 55

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Jan 18, 2027
7.5 Year Payment $3600.00 $1800.00 $900.00 Jan 18, 2031
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jan 18, 2035
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00