Equipment determination method of cogeneration system, equipment determination device thereof, and computer readable recording medium thereof

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11703233
APP PUB NO 20210302032A1
SERIAL NO

17203956

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

An equipment determination method of a cogeneration system includes the steps of: calculating a total hot water supply load for each day over a predetermined period longer than a specific period based on each unit hot water supply load for hour according to hot water supply use by consumers; setting as a representative period a specific period on which the total hot water supply load becomes at least a low load among the calculated total hot water supply load for each day; determining a capacity of the cogeneration equipment based on the total hot water supply load on the set representative period; and determining a capacity of the plurality of hot water storage tanks based on an amount of hot water supply load exceeding the capacity of the determined cogeneration equipment among each unit hot water supply load for two or more divided periods including the set representative period.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
YAZAKI ENERGY SYSTEM CORPORATION4-28 MITA 1-CHOME MINATO-KU TOKYO 108-8333

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Inagaki, Motomi Hamamatsu, JP 4 2
Kudo, Tomoharu Hamamatsu, JP 1 1
Yamada, Yohsuke Hamamatsu, JP 4 2

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Jan 18, 2027
7.5 Year Payment $3600.00 $1800.00 $900.00 Jan 18, 2031
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jan 18, 2035
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00