Batch-type substrate processing apparatus and operation method thereof

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11702737
APP PUB NO 20210017644A1
SERIAL NO

16908716

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Provided is a batch-type substrate processing apparatus. The substrate processing apparatus includes a vertical reaction tube having an internal space for receiving a substrate boat in which a substrate is stacked in multiple stages, a deposition gas supply unit configured to supply a deposition gas inside the reaction tube, a heater disposed outside the reaction tube to provide a thermal energy inside the reaction tube, and an adhesion layer coated on an inner wall of the reaction tube and to which a deposition by-product layer by an excess deposition gas is attached.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
EUGENE TECHNOLOGY CO LTD42 CHUGYE-RO YANGJI-MYEON CHEOIN-GU YONGIN-SI GYEONGGI-DO 17156

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Choi, Kyu Jin Seongnam-Si, KR 49 131
Kim, Hee Seok Seongnam-Si, KR 30 144
Lee, Kang Il Yongin-Si, KR 13 15

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Jan 18, 2027
7.5 Year Payment $3600.00 $1800.00 $900.00 Jan 18, 2031
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jan 18, 2035
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00