System and process for producing diluent from dilbit, transportation, and treatment of heavy oil

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11697984
SERIAL NO

17535639

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A process for producing diluent for use in a hydrocarbon recovery process includes heating a dilbit feed stream comprising hydrocarbons produced from a hydrocarbon reservoir and an added diluent, to a temperature of 350° C. or less, fractionating the dilbit feed stream after heating to produce a light fraction and a heavy fraction, the light fraction comprising the diluent, additional light hydrocarbons, and sour water, separating the sour water from a remainder of the light fraction, and stabilizing the remainder of the light fraction to provide recovered diluent and cooling the recovered diluent. A volume of the recovered diluent is greater than a volume of the added diluent.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
CENOVUS ENERGY INCCALGARY

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Bell, Kelly Margaret Foothills, CA 1 0
Butler, Meghan Elizabeth Edmonton, CA 1 0
Dong, Dahai Calgary, CA 8 39
Hicks, Steve Calgary, CA 4 24
Koskowich, Timothy Michael Calgary, CA 2 1
Palmisano, Eusebio Calgary, CA 4 81
Somerville, Michael Calgary, CA 1 0
Stillwell, Michael Douglas Calgary, CA 1 0

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Jan 11, 2027
7.5 Year Payment $3600.00 $1800.00 $900.00 Jan 11, 2031
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jan 11, 2035
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00