Power landscaping tool ensemble for using multiple tool heads

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11697199
APP PUB NO 20220266437A1
SERIAL NO

17183600

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A power tool ensemble includes at least a power head, a first shaft coupler, and a second shaft coupler, for use with tool heads of landscaping tools. The power head includes a motor and a power shaft mechanically coupled to the motor. Each shaft coupler includes a power shaft connecter for connecting to the power shaft, and a shaft-specific connecter for connecting to tool shafts of the tool heads. In each shaft coupler, the power shaft connecter is mechanically coupled to the shaft-specific connecter. The shaft-specific connecter in the first shaft coupler has a different tool shaft configuration from the shaft-specific connecter in the second shaft coupler.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
TOWA INDUSTRIES INCORPORATED480 E MCGLINCEY LN CAMPBELL CA 95008

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Ogawa,, Sr Richard K Palo Alto, US 4 4
Silorio, Ron Pittsburg, US 8 5

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Jan 11, 2027
7.5 Year Payment $3600.00 $1800.00 $900.00 Jan 11, 2031
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jan 11, 2035
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00