Reticle pod for preventing haze contamination and reticle stocker having the same

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11693307
APP PUB NO 20210157227A1
SERIAL NO

16694958

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A stocker for holding a plurality of reticle pods is provided. Each of the reticle pods is configured to accommodate a reticle assembly. The reticle assembly includes a reticle and a pellicle covering the reticle. The stocker includes a main frame and an electrostatic generator. The main frame has an inner space and at least one pod support disposed in the inner space. The pod support divides the inner space into a plurality of chambers configured to respectively accommodate the plurality of reticle pods. The electrostatic generator is coupled to the reticle assembly and configured to generate static electricity to the reticle assembly. The static electricity alternates between positive electricity and negative electricity.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
XIA TAI XIN SEMICONDUCTOR (QING DAO) LTDSINO-GERMAN ECOPARK NO 172 TAIBAISHAN RD HUANGDAO DISTRICT QINGDAO CITY QINGDAO

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Kwon, Byung-In Singapore, SG 9 1
Lee, Dae-Youp Singapore, SG 21 250
Yoo, Jiyong Singapore, SG 11 132

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Jan 4, 2027
7.5 Year Payment $3600.00 $1800.00 $900.00 Jan 4, 2031
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jan 4, 2035
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00