System and method for estimating photovoltaic energy through irradiance to irradiation equating with the aid of a digital computer

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11693152
APP PUB NO 20210285991A1
SERIAL NO

17328688

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The accuracy of photovoltaic simulation modeling is predicated upon the selection of a type of solar resource data appropriate to the form of simulation desired. Photovoltaic power simulation requires irradiance data. Photovoltaic energy simulation requires normalized irradiation data. Normalized irradiation is not always available, such as in photovoltaic plant installations where only point measurements of irradiance are sporadically collected or even entirely absent. Normalized irradiation can be estimated through several methodologies, including assuming that normalized irradiation simply equals irradiance, directly estimating normalized irradiation, applying linear interpolation to irradiance, applying linear interpolation to clearness index values, and empirically deriving irradiance weights. The normalized irradiation can then be used to forecast photovoltaic fleet energy production.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • CLEAN POWER RESEARCH, L.L.C.

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Hoff, Thomas E Napa, US 90 292

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Jan 4, 2027
7.5 Year Payment $3600.00 $1800.00 $900.00 Jan 4, 2031
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jan 4, 2035
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00