Multi-stage serial turbo-generator system for supercritical CO2 power cycles

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11689130
SERIAL NO

17446816

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A supercritical CO2 turbo-generator system includes multiple turbine generator units, a direct current bus, a plurality of active rectifiers, and a voltage controller. Each turbine generator unit includes a turbine with a supercritical CO2 input and a supercritical CO2 output, a generator with an electrical input and power output, a shaft connecting the turbine and generator, and a speed sensor for sensing shaft speed. The turbine generator units are connected in a cascading series with the input of a first turbine generator unit connected to a heated supercritical CO2 source and the input of each subsequent turbine generator unit is connected to the output of a prior turbine generator unit. The voltage controller monitors the speed sensor of the turbine generator units and varies the load on each generator to control shaft speed. Each active rectifier converts the power output of a generator to direct current, and the power from multiple active rectifiers is combined by the direct current bus.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • HELIOGEN HOLDINGS, INC.

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Carlson, Matthew David Littleton, US 6 3
Kalra, Chiranjeev Singh Irvine, US 12 65

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Dec 27, 2026
7.5 Year Payment $3600.00 $1800.00 $900.00 Dec 27, 2030
11.5 Year Payment $7400.00 $3700.00 $1850.00 Dec 27, 2034
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00