Ice maker with pulsed fill routine

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11686519
APP PUB NO 20230017067A1
SERIAL NO

17378997

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A batch ice maker can execute a pulsed fill routine in which a control system pulses water from a water supply into the sump until the sump reaches a predefined freeze routine starting level. Pulsing may begin after continuously filling the sump to a fill-approach level. A batch ice maker can execute a differential freeze routine in which the control system circulates water from a sump to an ice formation device until water level decreases by a predefined differential amount from a high control water level based on the water level in the sump at a point in time after the sump was filled to a freeze routine starting level. The high control water level can be set based on water level in the sump when sump water temperature reaches a predefined pre-chill temperature. The predefined pre-chill temperature can be associated with a switchover from sensible cooling to latent cooling.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
TRUE MANUFACTURING CO INC2001 EAST TERRA LANE O'FALLON MO 63366

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Knatt, Kevin O'Fallon, US 52 241

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Dec 27, 2026
7.5 Year Payment $3600.00 $1800.00 $900.00 Dec 27, 2030
11.5 Year Payment $7400.00 $3700.00 $1850.00 Dec 27, 2034
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00