System and method for fabricating a composite structure

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11685128
SERIAL NO

17515831

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A system for fabricating a composite structure includes a ply carrier including a ply support surface configured to support at least one composite ply. The system includes a carrier transfer device configured to convey the ply carrier. The system includes a lamination system configured to selectively apply the at least one composite ply to the ply support surface of the ply carrier. The system includes a transfer system configured to remove the ply carrier from the carrier transfer device and to apply the at least one composite ply to at least a portion of a forming surface of a forming tool. The system includes a forming system configured to form the at least one composite ply over the at least a portion of the forming surface of the forming tool.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
THE BOEING COMPANY100 NORTH RIVERSIDE PLAZA CHICAGO IL 60606-1596

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Bunker, Mark Seattle, US 28 222
Jones, Darrell Mill Creek, US 6 2
Justice, Jeremy Mill Creek, US 5 2
Klempel, Gregory Seattle, US 1 2
Krajca, Scott Seattle, US 7 2
Lund, Erik Mercer Island, US 19 170
Ly, Long Renton, US 8 19
Morris, Wade Auburn, US 2 11
Oviir, Marko Seattle, US 3 2
Smith, Daniel Woodinville, US 329 5555
Wilcoxson, Chace Kent, US 7 3
Willden, Kurtis Kent, US 9 59

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Dec 27, 2026
7.5 Year Payment $3600.00 $1800.00 $900.00 Dec 27, 2030
11.5 Year Payment $7400.00 $3700.00 $1850.00 Dec 27, 2034
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00