Self-calibrating timing generator

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11683025
SERIAL NO

17849747

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A timing generator includes a first current source, a first switch, a second current source, a second switch, a third switch, a capacitor, a signal synthesizer, and a timing difference extractor. The first current source is for generating a first current according to the input voltage. The second current source is for generating a second current according to the input voltage. The first switch includes a control terminal for receiving a charging signal. The second switch includes a control terminal for receiving a timing difference signal. The third switch includes a control terminal for receiving a reset signal. The capacitor is coupled between a charging terminal and a ground terminal. The signal synthesizer is for generating a timing signal according to a charging voltage and a reference voltage. The timing difference extractor is for generating a timing difference signal according to the timing signal and a deformed timing signal.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
RICHTEK TECHNOLOGY CORPHSINCHU COUNTY

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Chuang, Yung-Chun Taipei, TW 21 31
Liu, Yu-Hsuan New Taipei, TW 34 103

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Dec 20, 2026
7.5 Year Payment $3600.00 $1800.00 $900.00 Dec 20, 2030
11.5 Year Payment $7400.00 $3700.00 $1850.00 Dec 20, 2034
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00