Protection of a surge arrester with a better protection against failure from thermal overload in case of a temporary overvoltage in an electrical grid line

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11682899
APP PUB NO 20220247170A1
SERIAL NO

17724871

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method for preventing an electrical grid from failure in case of a temporary overvoltage includes providing an electrical grid line, a surge arrester and a disconnector device with a disconnector unit. The method further includes connecting the surge arrester at one terminal to the electrical grid line, connecting the surge arrester at its other terminal to a first terminal of the disconnector device, and connecting a second terminal of the disconnector device to ground potential. The method further includes interrupting the electrical connection in between the electrical grid line and the ground potential in response to a temporary overvoltage. The method further includes protecting the surge arrester from failure due to a thermal overload caused by the temporary overvoltage by operating the disconnector device before the surge arrester fails due to a thermal overload of the surge arrester.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
HITACHI ENERGY LTDBROWN-BOVERI-STRASSE 5 ZUERICH 8050 SWITZERLAND

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Antelo, Joel Wangen bei Olten, CH 4 23
Boese, Ronald Wettingen, CH 3 17
Gariboldi, Nicola Nussbaumen, CH 12 56
Mugwyler, Remo Pittsburgh, US 7 23

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Dec 20, 2026
7.5 Year Payment $3600.00 $1800.00 $900.00 Dec 20, 2030
11.5 Year Payment $7400.00 $3700.00 $1850.00 Dec 20, 2034
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00