Switchgear

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11682885
APP PUB NO 20210305788A1
SERIAL NO

17344975

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A switchgear or control gear includes: a first compartment; at least one removable module; a plurality of main switchgear or control gear components; and a plurality of auxiliary switchgear or control gear components. The plurality of main switchgear or control gear components are sub-divided into a first group of components that have a lifetime greater than a threshold level and a second group of components that have a lifetime less than or equal to the threshold level. The plurality of auxiliary switchgear or control gear components are sub-divided into a first group of components that have a lifetime greater than the threshold level and a second group of components that have a lifetime less than or equal to the threshold level.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
ABB SCHWEIZ AGBRUGGERSTRASSE 66 BADEN 5400

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Budde, Christoph Heidelberg, DE 6 7
Cernohous, Josef Jamne nad Orlici, CZ 18 17
Javora, Radek Hrusovany u Brna, CZ 35 64
Kozel, Tomas Brno, CZ 30 52
Simonidis, Christian Karlsruhe, DE 5 11

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Dec 20, 2026
7.5 Year Payment $3600.00 $1800.00 $900.00 Dec 20, 2030
11.5 Year Payment $7400.00 $3700.00 $1850.00 Dec 20, 2034
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00