Metering valve and jet pump unit for controlling a gaseous medium

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11682776
APP PUB NO 20210091393A1
SERIAL NO

16634274

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The invention relates to a metering valve (1) for controlling a gaseous medium, in particular hydrogen, comprising a valve housing (2), wherein an interior space (3) is formed in the valve housing (2). A reciprocating closing element (10) is arranged in the interior space (3), which interacts with a valve seat (37) for opening or closing at least one passage channel (25). Furthermore, the metering valve (1) comprises a nozzle (11), the at least one passage channel (25) being formed in the nozzle (11) and the passage channel (25) having a circular-cylindrical portion.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
ROBERT BOSCH GMBHSTUTTGART GERMANY

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Gruenberger, Andreas Spraitbach, DE 9 28
Magel, Hans-Christoph Reutlingen, DE 102 505
Richter, Armin Leinfelden-Echterdingen, DE 7 1
Wursthorn, Stephan Esslingen A.N., DE 3 15

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Dec 20, 2026
7.5 Year Payment $3600.00 $1800.00 $900.00 Dec 20, 2030
11.5 Year Payment $7400.00 $3700.00 $1850.00 Dec 20, 2034
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00