Method for producing actinium-225 from a radium-226 target by shielding the target from thermal neutrons in a moderated nuclear reactor

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11682498
SERIAL NO

17555131

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method for the manufacture of Actinium-225 from a Radium-226 containing material. Radium-226 containing starting target material is shielded with a thermal neutron absorption shield and is subjected to neutron irradiation from a moderated nuclear reactor. Radium-226 is thereby converted into Radium-225 to provide a Radium-225-containing material. The Radium-225 in the Radium-225 containing material is allowed to decay into Actinium-225, and the Actinium-225 is isolated from the Radium-225 containing material. The neutron absorption shield shields the starting target material from neutrons having an energy in the range of 20 eV to 1000 eV.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
STICHTING NUCLEAR RESEARCH AND CONSULTANCY GROUPWESTERDUINWEG 3 32 1755 LE PETTEN NETHERLANDS

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Asquith, Nicola Petten, NL 1 0
Bakker, Klaas Petten, NL 5 42
De, Groot Sander Petten, NL 4 0

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Dec 20, 2026
7.5 Year Payment $3600.00 $1800.00 $900.00 Dec 20, 2030
11.5 Year Payment $7400.00 $3700.00 $1850.00 Dec 20, 2034
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00