Litter with curved feet for easy loading

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11679042
APP PUB NO 20230143561A1
SERIAL NO

17521965

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A litter for carrying an injured person and method of making the same is provided. The litter comprises a pair of frame rails defining a middle space therebetween. A carrying structure is supported by the pair of frame rails in the middle space and defines a top surface and a bottom surface. The carrying structure is configured to support an injured person on the top surface. The litter further comprises at least one spreader bar disposed between the pair of frame rails. At least one foot defining a top and a bottom may be attached to a bottom side of either the at least one spreader bar or at least one of the pair of frame rails. The at least one foot defines a curved surface leading downwardly from the top to the bottom vertically away from the top surface of the carrying structure and horizontally towards the middle space.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
ROMEO SIX LLC260 PREMIER DR HOLLY SPRINGS NC 27540

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Carr, William Bryan Apex, US 6 24
Fanelli, Joseph Andrew Cameron, US 3 1

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Dec 20, 2026
7.5 Year Payment $3600.00 $1800.00 $900.00 Dec 20, 2030
11.5 Year Payment $7400.00 $3700.00 $1850.00 Dec 20, 2034
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00