Method for the in situ production of Majorana material superconductor hybrid networks and to a hybrid structure which is produced using the method

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11678590
SERIAL NO

17355218

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method for producing a hybrid structure, the hybrid structure including at least one structured Majorana material and at least one structured superconductive material arranged thereon includes producing, on a substrate, a first mask for structured application of the Majorana material and a further mask for structured growth of the at least one superconductive material, which are aligned relatively to one another, and applying the at least one structured superconductive material to the structured Majorana material with the aid of the further mask. The structured application of the Majorana material and of the at least one superconductive material takes place without interruption in an inert atmosphere.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
FORSCHUNGSZENTRUM JUELICH GMBHFACHBEREICH PATENTE JUELICH 52425

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Gruetzmacher, Detlev Niederzier, DE 7 22
Rosenbach, Daniel Juelich, DE 2 9
Schaepers, Thomas Aachen, DE 3 9
Schueffelgen, Peter Cologne, DE 2 9

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Dec 13, 2026
7.5 Year Payment $3600.00 $1800.00 $900.00 Dec 13, 2030
11.5 Year Payment $7400.00 $3700.00 $1850.00 Dec 13, 2034
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00