Apparatus and method for selecting cell in wireless communication system

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11677447
SERIAL NO

17528725

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The present disclosure relates to a pre-5th-Generation (5G) or 5G communication system to be provided for supporting higher data rates Beyond 4th-Generation (4G) communication system such as Long Term Evolution (LTE). An apparatus of a terminal in a wireless communication system is provided. The apparatus includes at least one transceiver and at least one processor operatively coupled to the at least one transceiver. The at least one processor is configured to control the transceiver to communicate through a cell determined based on information regarding a strength of a received signal for a first cell and a path diversity (PD) for the first cell. The PD comprises information regarding paths associated with the first cell.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • SAMSUNG ELECTRONICS CO., LTD.

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Baek, Ingil Suwon-si, KR 17 59
Jeong, Junhee Bucheon-si, KR 17 59
Jung, Doyoung Suwon-si, KR 50 494
Ryou, Sangkyou Suwon-si, KR 19 53

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Dec 13, 2026
7.5 Year Payment $3600.00 $1800.00 $900.00 Dec 13, 2030
11.5 Year Payment $7400.00 $3700.00 $1850.00 Dec 13, 2034
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00