Composition for forming resist overlayer film for EUV lithography

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11675269
APP PUB NO 20130209940A1
SERIAL NO

13880470

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

There is provided a composition for forming an EUV resist overlayer film that is used in an EUV lithography process, that does not intermix with the EUV resist, that blocks unfavorable exposure light for EUV exposure, for example, UV light and DUV light and selectively transmits EUV light alone, and that can be developed with a developer after exposure. A composition for forming an EUV resist overlayer film used in an EUV lithography process including a resin containing a naphthalene ring in a main chain or in a side chain and a solvent, in which the resin may include a hydroxy group, a carboxy group, a sulfo group, or a monovalent organic group having at least one of these groups as a hydrophilic group.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
NISSAN CHEMICAL INDUSTRIES LTDCHIYODA-KU TOKYO 101-0054

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Endo, Takafumi Toyama, JP 85 967
Ho, Bangching Toyama, JP 12 531
Sakamoto, Rikimaru Toyama, JP 115 978

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Dec 13, 2026
7.5 Year Payment $3600.00 $1800.00 $900.00 Dec 13, 2030
11.5 Year Payment $7400.00 $3700.00 $1850.00 Dec 13, 2034
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00