Pultruded fiber reinforced polymer building systems and methods

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11674312
SERIAL NO

17411041

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A composite building system comprising a structural frame, walls, floor, and roof is made of pultrusion fiber reinforced polymer (PFRP) material. A combination of PFRP, stainless steel screws and flexible epoxy can be used in the manufacture of a mobile or fixed structure. During assembly, an intumescent fire barrier can be applied to the PFRP components. Unlike traditional building materials, an exterior waterproof finish coating is not required when using a PFRP wall, floor, and roof assembly. The PFRP wall and wall assembly can be used with both PFRP structural framing and traditional framing materials, such as concrete, steel, or wood, allowing the PFRP wall and wall assembly to be used as a mid-rise or high-rise curtain wall.

First Claim

See full text

Other Claims data not available

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
NORTHSTAR TECHNOLOGIES GROUP INC9201 COCKLESHELL CT #10 BONITA SPRINGS FL 34135

International Classification(s)

loading....
  • 2021 Application Filing Year
  • E04B Class
  • 939 Applications Filed
  • 480 Patents Issued To-Date
  • 51.12 % Issued To-Date
Click to zoom InYear of Issuance% of Matters IssuedCumulative IssuancesYearly Issuances202120222023202420250255075100

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Inglese, Paul A Naples, US 6 2

Cited Art Landscape

Load Citation

Patent Citation Ranking

  • 1 Citation Count
  • E04B Class
  • 84.32 % this patent is cited more than
  • 2 Age
Citation count rangeNumber of patents cited in rangeNumber of patents cited in various citation count ranges1355251101 - 1011 - 200100200300400500600700800900100011001200130014001500

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Dec 13, 2026
7.5 Year Payment $3600.00 $1800.00 $900.00 Dec 13, 2030
11.5 Year Payment $7400.00 $3700.00 $1850.00 Dec 13, 2034