Method for fabricating a crystalline metal-phosphide hetero-layer by converting first and second crystalline metal-source layers into first and second crystalline metal phosphide layers

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11674237
APP PUB NO 20200362446A1
SERIAL NO

16411651

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Fabricating a crystalline metal-phosphide layer may include providing a crystalline base substrate and a step of forming a crystalline metal-source layer. The method may further include performing a chemical conversion reaction to convert the metal-source layer to the crystalline metal phosphide layer. One or more corresponding semiconductor structures can be also provided.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
INTERNATIONAL BUSINESS MACHINES CORPORATIONNEW ORCHARD ROAD ARMONK NY 10504

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Baumgartner, Yannick Thalwil, CH 3 0
Czornomaz, Lukas Zurich, CH 60 513
Fompeyrine, Jean Waedenswil, CH 53 536
Gotsmann, Bernd W Horgen, CH 59 252

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Dec 13, 2026
7.5 Year Payment $3600.00 $1800.00 $900.00 Dec 13, 2030
11.5 Year Payment $7400.00 $3700.00 $1850.00 Dec 13, 2034
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00