Laminate

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11673376
APP PUB NO 20190344545A1
SERIAL NO

16470319

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The invention provides a laminate including a fluoroelastomer layer and a fluororesin layer which are firmly bonded to each other. The laminate includes a fluoroelastomer layer (A) and a fluororesin layer (B) stacked on the fluoroelastomer layer (A). The fluoroelastomer layer (A) is a layer formed from a fluoroelastomer composition. The fluoroelastomer composition contains a fluoroelastomer, a basic multifunctional compound, and at least one compound (a) selected from the group consisting of a fluororesin (a1) and a phosphorus compound (a2). The compound (a) is present in an amount of 0.01 to 120 parts by mass relative to 100 parts by mass of the fluoroelastomer. The fluororesin layer (B) is formed from a fluororesin (b1) having a fuel permeability coefficient of 2.0 g·mm/m2/day or lower.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
DAIKIN INDUSTRIES LTDOSAKA-SHI OSAKA 5308323

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Inaba, Takeshi Osaka, JP 57 350
Kuwajima, Yuuki Osaka, JP 34 144
Masui, Toshiaki Osaka, JP 15 33
Osawa, Kozue Osaka, JP 4 2

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Dec 13, 2026
7.5 Year Payment $3600.00 $1800.00 $900.00 Dec 13, 2030
11.5 Year Payment $7400.00 $3700.00 $1850.00 Dec 13, 2034
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00