Structure of water mill

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11673221
SERIAL NO

16517260

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

An improved structure of water mill has a body provided with a handle part, a body part, a working head base and a pressing control switch. The handle part is provided with an intake passage, an exhaust passage, and a water inlet reversing passage. By triggering the pressing control switch, a high-pressure gas is guided into the intake passage and the body to drive the water grinder. A water pump gas outlet is provided with a double sleeve tube connected to a sealed water storage tank. The discharged high-pressure gas is guided into the sealed water storage tank through the outer tube of the double sleeve tube, so that the stored water is pressed back to the double sleeve tube and is simultaneously guided into the water inlet reversing passage. Finally, the water is guided out to the working head base, with simultaneous grinding and water cooling.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
S Y PNEUMATIC INDUSTRIAL CONO 35 YONGYI 8TH ST TAIPING DIST TAICHUNG 41141

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Wang, Shih-Ming Taichung, TW 72 822

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Dec 13, 2026
7.5 Year Payment $3600.00 $1800.00 $900.00 Dec 13, 2030
11.5 Year Payment $7400.00 $3700.00 $1850.00 Dec 13, 2034
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00