Ground leakage current power supply for microprocessor

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11672071
SERIAL NO

17464218

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A power supply, includes: a hot node coupled to a hot wire of an AC source, and a ground node coupled to an earth ground, where a neutral wire of the source is not present; a storage component, coupled to a return node and in series with a current limiter, where the current limiter enables the storage component to charge to a voltage while limiting leakage current to a prescribed value; a low voltage power supply including a linear voltage regulator, coupled to the storage component and to a return node that provides a reference voltage, where the low voltage power supply receives the voltage and generates an output voltage on an output node that is referenced to the reference voltage; and a microprocessor that employs the output voltage to wake from a low power mode to an active mode.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
FABRIQ LTD7181 FOUR RIVERS RD BOULDER CO 80301

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
O'Kelley, Matthew B Boulder, US 25 324
Reh, Jeffrey G Longmont, US 32 360

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Dec 6, 2026
7.5 Year Payment $3600.00 $1800.00 $900.00 Dec 6, 2030
11.5 Year Payment $7400.00 $3700.00 $1850.00 Dec 6, 2034
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00