Air data probe with enhanced conduction integrated heater bore and features

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11662235
APP PUB NO 20230107330A1
SERIAL NO

17492325

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A probe head of an air data probe includes a body extending from a first end to a second end of the probe head and a rod heater. The body includes an inlet adjacent the first end of the probe head, an air passageway extending through the body from the inlet to a second end of the probe head, a water dam extending radially through the body such that the air passageway is redirected around the water dam, a heater bore extending within the body, and an enhanced conduction area between heater bore and an exterior surface of the probe head. The inlet, the air passageway, the water dam, and the heater bore are all unitary to the body. The rod heater is positioned within the heater bore.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
ROSEMOUNT AEROSPACE INC14300 JUDICIAL ROAD BURNSVILLE MN 55306-4898

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Isebrand, Scott D Minneapolis, US 18 62
Seidel, Greg Allen Farmington, US 15 57
Wigen, Scott Eagan, US 21 74

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Nov 30, 2026
7.5 Year Payment $3600.00 $1800.00 $900.00 Nov 30, 2030
11.5 Year Payment $7400.00 $3700.00 $1850.00 Nov 30, 2034
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00