Progressive rate leaf spring for vehicle suspension system

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11660926
SERIAL NO

17493378

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A variable rate leaf spring vehicle suspension system includes a vehicle frame. The suspension system also includes a single leaf spring extending from a first end to a second end. The suspension system further includes a tension shackle pivotably coupled to the vehicle frame about an axis, the tension shackle defining a channel, the second end of the leaf spring disposed within the channel of the tension shackle, wherein the axis about which the tension shackle is pivotable is below the second end of the leaf spring.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
RASSINI SUSPENSIONES S A DE C VPEDREGAL #24 PISO 7 COL MOLINO DEL REY C P CIUDAD DE MEXICO 11040

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Berlingieri, Anthony Plymouth, US 11 10
Diego, Guedea Ramón Heberto Ann Arbor, US 3 1
Johnson, Aaron N Westland, US 3 1
Ruiz, Juárez José Guadalupe Coahuila, MX 3 1
Wong, Juan Jose Coahuila, MX 6 4
Zeimet, James N Commerce Township, US 9 8

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Nov 30, 2026
7.5 Year Payment $3600.00 $1800.00 $900.00 Nov 30, 2030
11.5 Year Payment $7400.00 $3700.00 $1850.00 Nov 30, 2034
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00