Method, apparatus, real time modeling and control system, for steam and steam with super-heat for enhanced oil and gas recovery

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11655698
APP PUB NO 20210222534A1
SERIAL NO

17133922

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Various embodiments of the present disclosure include a system for reducing an operating expense and a steam oil ratio (SOR) of at least one of an enhanced oil recovery system and a gas recovery system. The system can include a boiler configured to produce steam. The system can further include a super-heater in fluid communication with the boiler, the super-heater configured to generate a plurality of super-heat levels in a plurality of sections of the at least one of the enhanced oil recovery system and the gas recovery system downstream of the super-heater, wherein the plurality of super-heat levels are implemented per each one of the plurality of downstream sections of the at least one of the enhanced oil recovery system and gas recovery system to reduce the SOR.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
HEAT IP HOLDCO LLCC/O KZMD ACQUISITION LLP 12 CARDEN PLACE ABERDEEN AB101UR

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Juranitch, James C Ft. Lauderdale, US 42 92
Reynolds, Alan Craig Novi, US 12 3
Skinner, Raymond Clifford Coral Springs, US 9 3

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Nov 23, 2026
7.5 Year Payment $3600.00 $1800.00 $900.00 Nov 23, 2030
11.5 Year Payment $7400.00 $3700.00 $1850.00 Nov 23, 2034
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00