Method for installing steel tube arches

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11655600
APP PUB NO 20210164176A1
SERIAL NO

17168177

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The disclosure relates to the technical field of bridge construction, in particular to a method for installing steel tube arches, which comprises the following steps: step S1, erecting steel tube arch assembling brackets; step S2, assembling a steel tube arch of longitudinally moving segment; step S3, installing temporary tie rods; step S4, dismantling the assembling brackets; step S5, longitudinally moving the steel tube arch of longitudinally moving segment; step S6, erecting an arch springing bracket and assembling small mileage arch springing segments; step S7, closing the steel tube arch; S8, arch falling and temporary auxiliary facilities dismantling; step S9, construction of concrete and suspenders in arch. The method for installing steel tube arches provided by the disclosure is safe, standardized and reliable, and the construction standard is prone to control.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
CHINA RAILWAY NO 3 ENGINEERING GROUP CO LTD030001 269 YINGZE STREET YINGZE DISTRICT TAIYUAN SHANXI TAIYUAN CITY SHANXI PROVINCE 030001

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Chen, Yubo Shanxi, CN 4 0
Dong, Tengfei Shanxi, CN 13 2
Ji, Changyong Shanxi, CN 1 0
Liu, Chenghong Shanxi, CN 2 3
Ma, Liang Shanxi, CN 261 1253
Song, Guoying Shanxi, CN 1 0
Wang, Yingmei Shanxi, CN 5 2
Zhang, Boxuan Shanxi, CN 1 0
Zhang, Yugen Shanxi, CN 44 70

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Nov 23, 2026
7.5 Year Payment $3600.00 $1800.00 $900.00 Nov 23, 2030
11.5 Year Payment $7400.00 $3700.00 $1850.00 Nov 23, 2034
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00