Yield map generation and control system

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11653588
APP PUB NO 20210022283A1
SERIAL NO

17067483

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

One or more information maps are obtained by an agricultural work machine. The one or more information maps map one or more agricultural characteristic values at different geographic locations of a field. An in-situ sensor on the agricultural work machine senses an agricultural characteristic as the agricultural work machine moves through the field. A predictive map generator generates a predictive map that predicts a predictive agricultural characteristic at different locations in the field based on a relationship between the values in the one or more information maps and the agricultural characteristic sensed by the in-situ sensor. The predictive map can be output and used in automated machine control.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • DEERE & COMPANY

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Anderson, Noel W Fargo, US 200 5020
Best, Cody W Silvis, US 5 13
Palla, Bhanu Kiran Reddy Bettendorf, US 95 558
Vandike, Nathan R Geneseo, US 158 659
Wold, Matthew T Bettendorf, US 18 31

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Nov 23, 2026
7.5 Year Payment $3600.00 $1800.00 $900.00 Nov 23, 2030
11.5 Year Payment $7400.00 $3700.00 $1850.00 Nov 23, 2034
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00