Digital phase-locked loop

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11646743
SERIAL NO

17654073

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A digital phase-locked loop (PLL) includes a time-to-digital converter (TDC) and a digitally controlled oscillator (DCO). The DCO generates a PLL clock signal and various sampling clock signals that are mesochronous. The TDC samples a phase difference between a reference clock signal and a frequency-divided version of the PLL clock signal based on the sampling clock signals and various enable signals. The enable signals are generated based on a calibration of the digital PLL. Each enable signal is associated with a sampling clock signal and indicates whether the associated sampling clock signal is to be utilized for sampling the phase difference. Further, the TDC generates control data indicative of the sampled phase difference. The DCO generates the PLL clock signal and the sampling clock signals based on the control data until the digital PLL is in a phase-locked state.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
NXP USA INC6501 WILLIAM CANNON DRIVE WEST AUSTIN TX 78735

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Jain, Deependra Kumar Noida, IN 10 8
Sabharwal, Pawan Ghaziabad, IN 2 4
Sinha, Anand Kumar Noida, IN 19 37
Thakur, Krishna GautamBudh Nagar, IN 29 122

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Nov 9, 2026
7.5 Year Payment $3600.00 $1800.00 $900.00 Nov 9, 2030
11.5 Year Payment $7400.00 $3700.00 $1850.00 Nov 9, 2034
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00