Termination for trench field plate power MOSFET

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11631763
APP PUB NO 20220231161A1
SERIAL NO

17657944

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A semiconductor device includes a substrate having opposed first and second major surface, an active area, and a termination area. Insulated trenches extend from the first major surface toward the second major surface, each of the insulated trenches including a conductive field plate and a gate electrode overlying the conductive field plate, the gate electrode being separated from the field plate by a gate-field plate insulator. The field plate extends longitudinally in both of the active and termination areas and the gate electrode is absent in the termination area. A body region of a first conductivity type extends laterally between pairs of the insulated trenches. First and second spacer regions of a second conductivity type extend laterally between the pairs of the insulated trenches at the termination area to produce segments of the first conductivity type between the first and second spacer regions that are isolated from the body region.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
NXP USA INC6501 WILLIAM CANNON DRIVE WEST AUSTIN TX 78735

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Grote, Bernhard Phoenix, US 39 90
Khemka, Vishnu Chandler, US 33 237
Qin, Ganming Chandler, US 29 126
Saxena, Tanuj Chandler, US 16 28
Zitouni, Moaniss Gilbert, US 32 167

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Oct 18, 2026
7.5 Year Payment $3600.00 $1800.00 $900.00 Oct 18, 2030
11.5 Year Payment $7400.00 $3700.00 $1850.00 Oct 18, 2034
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00