Metal article, method for manufacturing the metal article, and metal composite

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11629428
APP PUB NO 20210370635A1
SERIAL NO

17332408

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A metal article comprises two metals, and a first hole and an oxide layer are set correspondingly on the surfaces of the two metals. To avoid the electrolytic corrosion on the interface between the two metals during the formation of the first hole, the disclosure provides a method of manufacturing the metal article. By putting a metal substrate in a first electrolyte including an etching agent and a passivating agent and applying electricity on the metal substrate, the metal article with the first hole is formed without electrolytic corrosion. The disclosure also provides a metal composite, which is formed by setting a material part in the first hole of the metal article.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
FULIAN YUZHAN PRECISION TECHNOLOGY CO LTDFOXCONN HONGGUAN SCIENCE PARK DASAN COMMUNITY GUANLAN STREET LONGHUA DISTRICT SHENZHEN CITY

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Hon, Kar-Wai New Taipei, TW 10 7
Yang, Ching-Hao New Taipei, TW 2 0
Zhang, Dong-Xu Shenzhen, CN 2 0
Zhou, Hao Shenzhen, CN 295 2054

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Oct 18, 2026
7.5 Year Payment $3600.00 $1800.00 $900.00 Oct 18, 2030
11.5 Year Payment $7400.00 $3700.00 $1850.00 Oct 18, 2034
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00