Integrated two-phase anaerobic dry fermentation reactor based on biomimetic principle of rumen

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11618871
APP PUB NO 20200208085A1
SERIAL NO

16632352

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

An integrated two-phase anaerobic dry fermentation reactor based on a biomimetic principle of rumen includes a reactor body; wherein the reactor body includes a dry fermentation chamber, a secondary fermentation chamber, and a liquid storage chamber. The dry fermentation chamber is arranged at an upper portion of the reactor body. The liquid storage chamber is arranged at a bottom of the reactor body. The secondary fermentation chamber is arranged between the dry fermentation chamber and the liquid storage chamber in the reactor body. The dry fermentation chamber is connected to the secondary fermentation chamber by a porous structure.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
CHINESE RESEARCH ACADEMY OF ENVIRONMENTAL SCIENCES100012 BEIJING CHAOYANG DISTRICT ANWAI DAYANGFANG NO 8 BEIJING CITY BEIJING CITY 100012

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Hao, Xin Beijing, CN 13 23
Li, Juan Beijing, CN 166 904
Lin, Mao Beijing, CN 5 0
Su, Jing Beijing, CN 172 1251
Sun, Yuanyuan Beijing, CN 26 137
Xi, Beidou Beijing, CN 42 9
Zheng, Mingxia Beijing, CN 7 0

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Oct 4, 2026
7.5 Year Payment $3600.00 $1800.00 $900.00 Oct 4, 2030
11.5 Year Payment $7400.00 $3700.00 $1850.00 Oct 4, 2034
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00