System and method for phase-change cooling of an electronic rack

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11612083
APP PUB NO 20220287207A1
SERIAL NO

17194143

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

According to one embodiment, a cooling system includes a primary condenser, a primary supply line and a primary return line that couples the primary condenser to a cold plate that is arranged to be used for electronics cooling to create a primary heat-transfer loop in which the condenser supplies liquid coolant to the cold plate and receives vapor produced by the cold plate, a secondary condenser, a secondary supply line that couples the secondary condenser to the primary supply line, a secondary return line that couples the secondary condenser to the primary return line, and a primary valve that is coupled to the secondary return line, where, in response to vapor pressure exceeding a pressure threshold, the valve at least partially opens to create a secondary heat-transfer loop in which the secondary condenser condense vapor back into liquid coolant that is supplied to the primary supply line.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
BAIDU USA LLC1195 BORDEAUX DR SUNNYVALE CA 94089

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Gao, Tianyi San Jose, US 273 690

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Sep 21, 2026
7.5 Year Payment $3600.00 $1800.00 $900.00 Sep 21, 2030
11.5 Year Payment $7400.00 $3700.00 $1850.00 Sep 21, 2034
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00