Method for preparing thermoplastic copolymer, thermoplastic copolymer prepared therefrom, and thermoplastic resin composition including the same

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11603421
APP PUB NO 20210054124A1
SERIAL NO

16979841

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The present invention relates to a method for preparing a thermoplastic copolymer using monomer droplets, a thermoplastic copolymer prepared therefrom and a thermoplastic resin composition including the same. In the preparation method, monomer droplets including an aromatic vinyl-based monomer are injected after reaching a polymerization conversion ratio of 10% to participate in the reaction after initiating polymerization, and a thermoplastic copolymer having an increased average particle diameter may be prepared in high yield.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
LG CHEM LTDSEOUL SOUTH KEREAN SEOUL

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Hong, Sung Won Daejeon, KR 19 53
Ju, Min Cheol Daejeon, KR 15 5
Kim, In Soo Daejeon, KR 89 377
Lee, Hyung Sub Daejeon, KR 20 26
Shin, Min Seung Daejeon, KR 17 6

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Sep 14, 2026
7.5 Year Payment $3600.00 $1800.00 $900.00 Sep 14, 2030
11.5 Year Payment $7400.00 $3700.00 $1850.00 Sep 14, 2034
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00