Sawtooh electric field drift region structure for planar and trench power semiconductor devices

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11594613
APP PUB NO 20210305406A1
SERIAL NO

17346271

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A lateral super junction JFET is formed from stacked alternating P type and N type semiconductor layers over a P-epi layer supported on an N+ substrate. An N+ drain column extends down through the super junction structure and the P-epi to connect to the N+ substrate to make the device a bottom drain device. N+ source column and P+ gate column extend through the super junction but stop at the P-epi layer. A gate-drain avalanche clamp diode is formed from the bottom the P+ gate column through the P-epi to the N+ drain substrate.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
ALPHA AND OMEGA SEMICONDUCTOR LTDSUNNYVALE CA

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Bhalla, Anup Santa Clara, US 325 5864
Bobde, Madhur San Jose, US 189 2487
Guan, Lingpeng Sunnyvale, US 95 1172
Yilmaz, Hamza Saratoga, US 292 5131

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Aug 28, 2026
7.5 Year Payment $3600.00 $1800.00 $900.00 Aug 28, 2030
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 28, 2034
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00