System and method for providing heated water to sabbath observers

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11592210
SERIAL NO

17340758

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A water supply system includes a main water tank that is configured to store water and includes a heater to heat the stored water to close to but below a boiling temperature thereof, to provide main heated water. A dispenser water tank receives a portion of the main heated water, and is free of any heating elements to add heat to the water stored therein, and providing dispensable heated water. A water mixer includes a first pipe for receiving the dispensable heated water from the dispenser tank and a second pipe for receiving utility water from a faucet that supplies utility-provided water, with a mixing chamber from which the waters from the first pipe and the second pipe are dispensed and/or in which these waters are admixed.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
MOSKOWITZ MAXFLUSHING NY

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Moskowitz, Max Flushing, US 21 523

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Aug 28, 2026
7.5 Year Payment $3600.00 $1800.00 $900.00 Aug 28, 2030
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 28, 2034
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00