System and method for connecting trailer towing components

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11590812
SERIAL NO

17445425

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A system for connecting trailer towing components may have a pin having a first leg and a second leg. The system may also have a torsion bar having a first set of splines, and a main beam for a trailer. The main beam may have an insert adapted to selectively receive the torsion bar therein. The main beam may also have at least one guide aperture adapted to selectively receive one of the pin legs. The system may also have a secondary beam adapted to be selectively located at least partially within the main beam. The secondary beam may have apertures adapted to receive at least one of the legs of the pin and the torsion bar.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
BIL-JAX INC125 TAYLOR PARKWAY ARCHBOLD OH 43502

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Bruner, Keith Raymond Wauseon, US 2 1
Knick-Koppenhofer, Brice Melvin Holgate, US 1 0
Reyes, Robert Warren Maumee, US 2 1

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Aug 28, 2026
7.5 Year Payment $3600.00 $1800.00 $900.00 Aug 28, 2030
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 28, 2034
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00