Bicycle wheel component with braking area made of composite material and related manufacturing process

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11590794
APP PUB NO 20190299704A1
SERIAL NO

16447307

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A process for manufacturing a bicycle wheel component, comprising the steps of providing a component having at least one braking area that cooperates with a braking body made by molding of composite material having structural fibers in a polymeric material, and post-molding machining of at least one region of the braking area by removing only polymeric material, without removal of the structural fiber, from the entire region so that the structural fiber outcrops at least in part from the polymeric material, and removing the structural fiber and possibly the polymeric material according to at least one groove within the region. A bicycle wheel component having a braking area of composite material, wherein in a region of the braking area, the structural fiber outcrops at least from the polymeric material, and the region comprises a groove through the structural fiber and possibly the polymeric material of the composite material.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
CAMPAGNOLO S R LVICENZA

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Fabris, Paolo Brendola, IT 10 12

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Aug 28, 2026
7.5 Year Payment $3600.00 $1800.00 $900.00 Aug 28, 2030
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 28, 2034
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00