Method for producing high-pressure gas storage container

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11590725
APP PUB NO 20210146647A1
SERIAL NO

17159763

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method produces a high-pressure gas storage container that includes a liner and a reinforcing layer. The liner houses a high-pressure gas. The reinforcing layer is formed by winding a plurality of strip-shaped reinforcing members around an outer perimeter surface of the liner. The method includes irradiating plasma on at least a portion of the reinforcing fibers, and adjusting an irradiation intensity of the plasma such that an irradiation amount of the plasma with respect to the reinforcing fibers becomes constant in accordance with changes in a transport speed of the reinforcing fibers.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
NISSAN MOTOR CO LTD2 TAKARA-CHO KANAGAWA-KU YOKOHAMA-SHI KANAGAWA 221-0023

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Kono, Kentaro Kanagawa, JP 12 50
Takemoto, Shinichiro Kanagawa, JP 20 99
Uchida, Hiroshi Kanagawa, JP 337 3104

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Aug 28, 2026
7.5 Year Payment $3600.00 $1800.00 $900.00 Aug 28, 2030
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 28, 2034
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00