Machine tool

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11590617
APP PUB NO 20200147736A1
SERIAL NO

16631613

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

According to the present invention, the operating rate of a machine tool can be increased. Solution is made by a machine tool including a processing chamber surrounded by cover walls to perform processing of a workpiece to be processed, an equerre a part of which is arranged inside the processing chamber, the equerre fixing the workpiece, an opening arranged at a part of the cover walls for access to an inside of the processing chamber, and shutter doors movable between open positions where opening of the opening is performed so that the inside of the processing chamber communicates with an outside of the processing chamber, and closed positions where closing of the opening is performed so that the inside of the processing chamber is isolated from the outside of the processing chamber.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
KIWA MACHINERY CO LTD522-51 HARADE KURAMOCHI-CHO NABARI-SHI MIE 518-0752

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Fukuda, Shinichi Nabari, JP 85 1106

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Aug 28, 2026
7.5 Year Payment $3600.00 $1800.00 $900.00 Aug 28, 2030
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 28, 2034
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00