Recognition kits and methods for harmful heavy metals

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11585793
APP PUB NO 20200400628A1
SERIAL NO

16891409

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The present disclosure relates to a kit and method for testing harmful heavy metals onsite, which can determine the presence or absence of harmful heavy metals and the degree of contamination with harmful heavy metals dissolved in water or contained in sediment, soil, deep-sea mining tailings and the like. The kit includes a receiving member and a diagnostic solution containing a biosurfactant, which is accommodated in the receiving member and undergoes an ion exchange reaction with a liquid including harmful heavy metals or a solid sample from which harmful heavy metals are leached in a liquid phase.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
KOREA INSTITUTE OF OCEAN SCIENCE & TECHNOLOGYBUSAN

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Kim, Kyoungrean Busan, KR 3 0
Lee, Aleum Busan, KR 1 0

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Aug 21, 2026
7.5 Year Payment $3600.00 $1800.00 $900.00 Aug 21, 2030
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 21, 2034
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00