Systems and methods for manufacturing a silk fibroin solution and powders containing silk fibroin

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11584784
APP PUB NO 20220372087A1
SERIAL NO

17650570

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The disclosure relates to systems and methods for improving the manufacturing of silk solutions and powders containing silk fibroin obtained from silkworm cocoons. The methods include use of a reactor vessel to degum, rinse, and dissolve the silk fibroin protein from silk inputs to obtain a food grade silk powder. The reactor vessel may include a combination of inputs and outputs for introducing and removing different components used or generated during the process. The systems may include any combination of heat exchangers, holding tanks, filtration modules, and post-treatment equipment as necessary to obtain the silk powder. The solutions and powders can be used to improve the post-harvest preservation of perishables and to improve the performance of packaging, including biodegradable packaging.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
CAMBRIDGE CROPS INC D/B/A MORI500 RUTHERFORD AVENUE SUITE 105 BOSTON MA 02129

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Abu-Taleb, Laith Gaithersburg, US 11 3
Baryshyan, Amanda Ipswich, US 5 16
Behrens, Adam Boston, US 15 6
Ellersick, John Patrick Cambridge, US 4 3
Garant,, III Herve Irenee West Bath, US 4 3
Groner, Jesse Cambridge, US 8 3
Lopez-Garcia, Rebeca Mexico City, MX 4 3
Marco, Nicole Somerville, US 4 3
Perrea, Lindsay Allston, US 4 3
Preston, Colin Salem, US 5 3
Rauch, Linda Michelle Amherst, US 4 3
Roman, Samantha Cambridge, US 4 3
Zhang, Nick Newton, US 5 75

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Aug 21, 2026
7.5 Year Payment $3600.00 $1800.00 $900.00 Aug 21, 2030
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 21, 2034
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00