Method of manufacturing hybrid parts consisting of metallic and non-metallic materials at high temperature

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11584115
APP PUB NO 20210237417A1
SERIAL NO

16802316

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

This invention generally relates to a method of manufacturing hybrid parts comprising metallic and non-metallic materials at high temperature. During the method, a hollow metallic feedstock heated to a temperature in the austenite region may be placed in a die and filled with a non-metallic material in a viscous condition, after which the feedstock in the die is formed and then controlled-cooled to cause hardening of the non-metallic material in the region of contact between the metallic and non-metallic material. Afterwards, the semi-finished product is removed from the die and cooled to room temperature. The rate of cooling may be adjusted to generate compressive stress in the surface layer of the non-metallic material, which reduces the risk of cracking.

First Claim

See full text

Other Claims data not available

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
ZAPADOCESKA UNIVERZITA V PLZNI301 00 PLZEN

International Classification(s)

loading....
  • 2020 Application Filing Year
  • C03C Class
  • 883 Applications Filed
  • 456 Patents Issued To-Date
  • 51.65 % Issued To-Date
Click to zoom InYear of Issuance% of Matters IssuedCumulative IssuancesYearly Issuances2020202120222023202420250255075100

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Masek, Bohuslav Kaznejov, CZ 18 33

Cited Art Landscape

Load Citation

Patent Citation Ranking

  • 0 Citation Count
  • C03C Class
  • 0 % this patent is cited more than
  • 2 Age
Citation count rangeNumber of patents cited in rangeNumber of patents cited in various citation count ranges55074201 - 1011 - 200255075100125150175200225250275300325350375400425450475500525550575600

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Aug 21, 2026
7.5 Year Payment $3600.00 $1800.00 $900.00 Aug 21, 2030
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 21, 2034