Crusher assembly for a jaw crusher

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11583864
SERIAL NO

16494004

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A crusher assembly for a jaw crusher having a swing jaw and a crusher jaw having teeth formed on the breaking sides thereof, the crusher jaw comprising end faces at the opposite ends thereof, wherein a clamping piece having a clamping surface acts on the one end face (35) and the other end face (35) is supported on a clamping piece, wherein the clamping piece and the clamping element are interchangeably connected to the swing jaw, wherein the swing jaw comprises a head part having a pivot bearing on the end region thereof facing away from the clamping piece, and wherein the crusher jaw at least partially covers the region of the swing jaw in front of the pivot bearing.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
KLEEMANN GMBHGERMAN GOPPINGEN GOEPPINGEN BADEN-WURTTEMBERG

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Blessing, Otto Bartholomä, DE 7 11
Kazmeier, Benjamin Owen, DE 1 0
Meier, Jochen Hülben, DE 18 15
Weller, Christian Esslingen, DE 9 1

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Aug 21, 2026
7.5 Year Payment $3600.00 $1800.00 $900.00 Aug 21, 2030
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 21, 2034
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00