Integrated process for production of glycerol carbonate (4-hydroxymethyl-2-oxo-1, 3-dioxolane) and urea

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11578034
SERIAL NO

16496497

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Systems and methods for integrated glycerol carbonate and/or urea production. This disclosure pertains to development of a process for production of glycerol carbonate and/or urea from ammonia, carbon dioxide and glycerol. The process integrates glycerol carbonate production into a urea production process. The urea produced in the production facility may be used to produce glycerol carbonate by reacting urea with glycerol. The ammonia generated by glycerol carbonate production may be recycled back to urea production. Unreacted urea from the glycerol carbonate production may be separated and recycled to the urea product stream. The systems and methods can reduce the cost for urea production and increase product value of the excessive glycerol produced from other chemical plants.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
SABIC GLOBAL TECHNOLOGIES B V4612 PX BERGEN OP ZOOM

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Ansari, Mohammed Bismillah Riyadh, SA 31 64
Bodas, Vijay Dinkar Riyadh, SA 23 24
Leal, Guillermo Riyadh, SA 31 95

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Aug 14, 2026
7.5 Year Payment $3600.00 $1800.00 $900.00 Aug 14, 2030
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 14, 2034
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00