Balanced current-source inverter

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11575329
SERIAL NO

17463676

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A switching circuit for a current source inverter includes a first inverter leg, a second inverter leg, and a controller. The first inverter leg includes a first reverse-voltage-blocking (RB) switch, a second RB switch, and a third RB switch that are connected in series between a first bus line and a second bus line. The second inverter leg includes a fourth RB switch, a fifth RB switch, and a sixth RB switch are connected in series between the first bus line and the second bus line. The controller is configured to control a switch between an on-state and an off-state for each RB switch. When in the on-state, a reverse voltage is blocked by a respective RB switch, and a current with a positive polarity is conducted through the respective RB switch. When in the off-state, a voltage and the current are blocked by the respective RB switch.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • WISCONSIN ALUMNI RESEARCH FOUNDATION

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Dai, Hang Madison, US 9 18
Jahns, Thomas Merlin Madison, US 8 149
Sarlioglu, Bulent Madison, US 27 321
Torres, Renato Amorim Madison, US 6 3

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Aug 7, 2026
7.5 Year Payment $3600.00 $1800.00 $900.00 Aug 7, 2030
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 7, 2034
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00