Priority load sharing for electrical power systems having multiple power sources

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11575262
APP PUB NO 20220278533A1
SERIAL NO

17663975

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Example electrical power systems include an output for supplying a DC output voltage to a load, a first power source connected with the output to supply DC power to the load, and a second power source connected with the output to supply DC power to the load. The electrical power system is configured to supply DC power to the load using only the first power source when a demand of the load is less than an output capacity of the first power source, and the second power source is configured to maintain an enabled on-state when only the first power source is supplying DC power to the load. Additional electrical power systems and methods are also disclosed.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
AES GLOBAL HOLDINGS PTE LTDSINGAPORE

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Begino,, III John Faustino Pasig, PH 4 0
Neri, Nathaniel Franco Taguig, PH 11 10

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Aug 7, 2026
7.5 Year Payment $3600.00 $1800.00 $900.00 Aug 7, 2030
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 7, 2034
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00