Pneumatic impact tool having vibration reducing structure

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11571797
SERIAL NO

17669709

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A pneumatic impact tool having a vibration reducing structure includes a handle with a bucket member and a directional control valve. A tube member including a cylindrical wall and a chamber is coupled with the bucket member. The chamber is divided into a front and a rear chamber portion by a hammer member. Gas may be guided into the front or the rear chamber portion by the directional control valve. A vent is disposed on the cylindrical wall. An exhaust channel which communicates with the front chamber portion and not communicates with the rear chamber portion is disposed on an outer peripheral surface of the hammer member. The hammer member is pushed to return if gas is guided into the front chamber portion. Gas in the front chamber portion is exhausted when the exhaust channel communicates with the vent.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
STORM PNEUMATIC TOOL CO LTDNO 539 DALI RD DALI DIST TAICHUNG CITY R O C

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Sun, Yung Yung Taichung, TW 27 117

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Aug 7, 2026
7.5 Year Payment $3600.00 $1800.00 $900.00 Aug 7, 2030
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 7, 2034
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00