Method of applying electron beam curable aqueous coating material

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11565280
SERIAL NO

17203073

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Provided is a method of applying an electron beam curable aqueous coating material, including coating a surface of a material to be coated with the electron beam curable aqueous coating material to form a wet coating film; drying the wet coating film until a time integration value of a reciprocal of an average value of viscosities of a region from a surface of the wet coating film to a depth of one half a film thickness of the wet coating film is in a range of 0.30 (Pa·s)−1·min to 0.90 (Pa·s)−1·min, which is acquired by an electric field pick-up method, and a solid content concentration of the wet coating film is 90% by mass or greater; and curing the obtained dry coating film by irradiation with an electron beam after the wet coating film is dried.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
TOYOTA JIDOSHA KABUSHIKI KAISHA1 TOYOTA-CHO TOYOTA-SHI AICHI-KEN 471-8571

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Ambo, Keiji Miyoshi, JP 10 12
Kouzaki, Mamoru Miyoshi, JP 4 1
Mori, Kanji Nagakute, JP 11 54
Nabeshima, Atsuo Okazaki, JP 12 38
Okazaki, Eiichi Takaoka, JP 29 93
Yomo, Shuji Nagakute, JP 7 2

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Jul 31, 2026
7.5 Year Payment $3600.00 $1800.00 $900.00 Jul 31, 2030
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jul 31, 2034
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00